FACILITIES AND PLANT LAYOUT REDESIGN FOR OPTIMAL EFFECTIVENESS IN WOOD PROCESSING INDUSTRY: A CASE STUDY OF ISEYIN SAWMILL
AREMU ADEBAYO, KAZEEM OYENIYI
20 Juli 2025 · International Journal of Engineering Processing and Safety Research
Summary
No reviewed summary yet. Read the abstract below or open the original publication.
Abstract
The wood processing industry in regions like Iseyin, Nigeria, faces significant operational challenges due to outdated facility layouts. These issues contribute to inefficiencies in material handling, elevated production costs, and poor space utilization. This study investigates the impact of facilities and plant layout redesign on operational effectiveness within the wood processing sector, with specific focus on the Iseyin Sawmill in Oyo State, Nigeria. The initial assessments revealed that the pre-existing layout created inefficiencies such as long material handling distances, underutilized floor areas, and poor workflow design, all of which negatively affected productivity and employee morale. A mixed-method research design was employed, integrating qualitative observation with quantitative analysis of data from 120 workers. The research utilized layout flow diagrams, distance charts, production logs, and employee feedback forms to evaluate both the original and redesigned layouts. Post-redesign analysis revealed notable improvements. Material handling distances across operational sections (cutting, sawing, drying, and packaging) were reduced by up to 320 meters. Daily production output increased by an average of 25%, rising from 120–130 units to 160–173 units per day across a typical workweek. Space utilization improved significantly, from 65% to 85%, as verified by facility floor analysis and visualized through pie charts. Additionally, employee satisfaction increased by 3.5 points, with positive feedback on ergonomics, workflow, safety, and reduced stress. Agreement levels among workers improved from an average of 18% to over 94%. However, demographic data showed most workers were aged 30–49 and had 5–10 years of experience, including machine operators (50%), supervisors (25%), maintenance staff (8%), and administrative/other roles (17%). These findings confirm that the redesign was well-received by a skilled and experienced workforce. Analytical models used to measure workflow and space efficiency affirmed the benefits of lean layout principles and ergonomic improvements, aligning with the objective of inclusive evaluation. The study emphasizes the strategic value of systematic layout redesign in enhancing productivity, safety, and employee satisfaction. It proposes a replicable model for small- and medium-scale manufacturing enterprises seeking to improve spatial efficiency and operational outcomes through structured facility planning.
Abstract as supplied by the source. Full text may be restricted by the publisher.
Related publications
Predicting the mechanical properties of sawn timber: Basic non-destructive tools applicable to Norway spruce sawlogs
1 Sep 2026 · Rostislav Berezjuk, Matěj Šimek, Robert Mařı́k et al. · Central European Forestry Journal
Evaluation of Wood Processing in the Sawmilling Industry in Ekiti State, Nigeria
1 Jul 2025 · Ademola Ayodeji Omoyeni, Timileyin Samuel Oguntuase · International Journal of Advances in Engineering and Management
Moisture-induced timber joining - Utilizing the hygroscopicity and shape-memory effect of wood resulting in dimensional change in a prefabricated wood-only, self-built, sawn timber system for affordable housing in Colombia
1 Mär 2024 · Max Salzberger, Juan Sebastian Cruz Rojas, Gilbert Koskamp · Research Square
Effects of thermal and chemical treatments on colourimetric characteristics of young African mahogany and eucalypts wood for sawn timber production
3 Jul 2026 · Joyce de Almeida Pinto, Juarez Benigno Paes, Graziela Baptista Vidaurre et al. · Southern Forests a Journal of Forest Science